
Description
Tucked away down a charming street in the sought-after St. Johns area of River Oaks, this new construction designed by Robert Dame and built by luxury builder Fifty Seventh + 7th features a refreshing combination of laid-back natural elements & sophisticated modern details. With a clean design and thoughtful floor plan, interior features include open kitchen w/extensive Calacatta marble, La Canche range, separate 36'' Subzero refrigerator+freezer, & dual pantries. Family room features Isokern fireplace, wall of 10 retractable doors open to loggia, & adjacent full bar. Dining room w/modern glass wine room. Handsome private library. 2nd floor primary w/exceptional marble bath & oversize dual closets. 4 additional well-appointed ensuite bedrooms, large game room. Elevator & Control4 whole-home automation. Exterior spaces include covered terrace and loggia with full summer kitchen, greenspace, automatic driveway gate, and private motor court. Estimated completion late summer 2021.
-
5BEDS
-
0.19ACRES
-
5BATHS
-
21/2 BATHS
-
7,012SQFT
-
$670$/SQFT
School Information
Description
Tucked away down a charming street in the sought-after St. Johns area of River Oaks, this new construction designed by Robert Dame and built by luxury builder Fifty Seventh + 7th features a refreshing combination of laid-back natural elements & sophisticated modern details. With a clean design and thoughtful floor plan, interior features include open kitchen w/extensive Calacatta marble, La Canche range, separate 36'' Subzero refrigerator+freezer, & dual pantries. Family room features Isokern fireplace, wall of 10 retractable doors open to loggia, & adjacent full bar. Dining room w/modern glass wine room. Handsome private library. 2nd floor primary w/exceptional marble bath & oversize dual closets. 4 additional well-appointed ensuite bedrooms, large game room. Elevator & Control4 whole-home automation. Exterior spaces include covered terrace and loggia with full summer kitchen, greenspace, automatic driveway gate, and private motor court. Estimated completion late summer 2021.